Question:
Costs are parallel to each WBS work package. The costs of each work package are aggregated to their corresponding control accounts. Each control account then is aggregated to the sum of the project costs.
Author: Mitch PalmerAnswer:
Cost aggregation
0 / 5 Â (0 ratings)
1 answer(s) in total