Question:
A system that examines any changes associated with scope changes, the cost of materials, and the cost of any other resources, and the associated impact on the overall project cost.
Author: Mitch PalmerAnswer:
Cost change control system
0 / 5 Â (0 ratings)
1 answer(s) in total