Question:
The author fixes all the severity 1 through 3 defects found during the meeting. If enough defects were found, or if enough refactoring or code changes had to occur, then another Inspection is scheduled. Regardless of how much code is changed, the moderator must check all the changes as part of the follow-up
Author: juzz trialAnswer:
Rework and Follow-up
0 / 5 Â (0 ratings)
1 answer(s) in total