SEARCH
You are in browse mode. You must login to use MEMORY

   Log in to start

EE Phase 4-MclovinIT


🇬🇧
In English
Created:


Public
Created by:
Athea Morris


0 / 5  (0 ratings)



» To start learning, click login

1 / 25

[Front]


What does GDP stand for?
[Back]


Gross Domestic Product

Practice Known Questions

Stay up to date with your due questions

Complete 5 questions to enable practice

Exams

Exam: Test your skills

Test your skills in exam mode

Learn New Questions

Popular in this course

Learn with flashcards

Dynamic Modes

SmartIntelligent mix of all modes
CustomUse settings to weight dynamic modes

Manual Mode [BETA]

Select your own question and answer types
Other available modes

Complete the sentence
Listening & SpellingSpelling: Type what you hear
multiple choiceMultiple choice mode
SpeakingAnswer with voice
Speaking & ListeningPractice pronunciation
TypingTyping only mode

EE Phase 4-MclovinIT - Leaderboard

0 users have completed this course. Be the first!

No users have played this course yet, be the first


EE Phase 4-MclovinIT - Details

Levels:

Questions:

73 questions
🇬🇧🇬🇧
What does GDP stand for?
Gross Domestic Product
What does GHP stand for?
Geothermal Heat Pump
What does GNP stand for?
Gross National Product
What does RIBA stand for?
Royal Institute of British Architects
What does RICS stand for?
Royal Institute of Chartered Surveyors
What does VOB stand for?
Construction contracts procedures
What does VOC stand for?
Volatile organic compound
What is a project team comprised of? (Hint: D-C-C)
Designers, Consultants, Contractors
Job of a quantity surveyor (UK)? (Hint: afp-costs, pp, fa, and settle cd)
A QS advise, forecast and plan costs, take part in the procurement procedure, prepare final accounts and settle financial disputes.
What does a building services engineer do? (Hint: advise on M&E aspects)
They advise on mechanical and electrical aspects of a project.
What does a landscape architect do?
They design and supervise external works.
What does an interior designer do?
They design architectural interiors and furnishing.
Explain the term: turnkey project (Hint: Turn over the key)
A project that is designed, developed and completely equipped before being sold to a buyer.
What does FSI stand for?
Floor Space Index
What does it mean for a plot to be developed?
Services such as water, electricity, and gas are provided.
What is sustainability?
“meeting today’s needs without compromising the ability of future generations to meet their needs”
Name 3 renewable sources of energy
Solar radiation, Wood, Waste, Wind,...
Name 3 non-renewable (exhaustible) energy sources
Petroleum, Hydrocarbon gas liquids, Natural gas, Coal, Nuclear energy, fossil fuels,...
Define the term: Energy payback time
Period required for an energy generating system to harvest the same quantity of energy as was invested in its production | time it takes for E_profit = E_invested
Define the term: Primary energy
Energy that exists in a naturally occurring form, such as coal, before being converted into an end-use form. | Pre-production energy
Define the term: Final energy
Quantity of energy provided to the end consumer after subtracting loss through conversion and transportation. | Usable energy post-production
Define the term: Geothermal energy
The thermal energy generated and stored in the ground. Earth tubes or energy piles in combination with heat pumps can make use of the higher ground temperatures. | Heat from the earth turned into usable energy.
Define the term: Embodied energy
Total of energy required for the extraction, processing and manufacturing of building materials. | Energy used for during the production process
Define the term: Energy storage
A means to retain the energy derived from a primary source for use at a later time.
Define the term: Energy efficiency
Less energy is used to provide the same level of performance, comfort and convenience, also referred to as efficient energy use.
What are the results of saving energy? (Hint: increased fc, eq, n & p security & hc)
Increased financial capital, environmental quality, national and personal security and human comfort.
What measures need to be taken to follow energy saving orders?
Make more energy efficient buildings with improved insulation, more airtightness and more efficient heating systems.
How do passive houses (which are almost energy-self-sufficient buildings) provide heating, warm water and electricity?
Passive houses use solar collectors and geothermal energy to provide heating and warm water, and photovoltaic elements to produce electricity.
Name 3 types of energy efficient houses
Eco house, zero-carbon house, 3 liter house
What does LCA stand for?
Life Cycle Assessment
What is a LCA used for?
It evaluates the environmental impacts of a development from conception through to demolition and disposal, i.e. from cradle to grave.
Name the 4 phases in LCA (Hint: G-L-L-I)
Goal and scope definition, Life cycle inventory analysis, Life cycle impact assessment, Interpretation.
What is the purpose of the Goal and scope definition phase in LCA?
The purpose is to identify the system boundary, the functional unit and determine the level of detail.
What is the purpose of the Life cycle inventory analysis phase in LCA?
This phase involves creating an inventory of all material quantities using product inventory databases.
What is the purpose of the Life cycle impact phase in ICA?
The inventory items from the LCI phase are analyzed for their impacts on human health and the environment.
What is the purpose of the Interpretation phase in LCA?
To check and evaluate the information from the third phase in order to meet the requirements determined in the goal and scope definition phase. The results are used to compare concepts and make improvements.
Define the term: Non-residential building
All buildings which are not used for living purposes.
Define the term: Residential building
A dwelling./ places where people live, and amongst others, include bungalows, blocks of flats and flat sharing communities.
Flip the card and read carefully until you understand the paragraphs about building costs.
The building costs include all the expenses for goods, services and charges necessary to carry out a development. Before planning and constructing a property, the client needs to be aware of all the expenses associated with the development. Architects and engineers have a detailed knowledge of the costs involved and are able to support the client by preparing a realistic cost estimate. The client will then be able to determine the feasibility and affordability of the project. The design team may need to recommend adjustments in order to bring the scope of the project into line with the client’s means. The final step of this early process is the agreement of the budget for the project. The total expense budget, at the start, is the sum of a large number of individual items. As work progresses, the expense budget is replaced by actual costs until, on completion, the final statement is drawn up with the total cost of the project. Throughout the period of development, as actual costs are invoiced, it is essential to monitor progress against the original budget or revised budget if alterations have been agreed along the way. Since there is a tendency for all parties to pitch estimates on the low side, it is always prudent to allow for a contingency sum.
What is the purpose of the structural system of a building?
It is meant to support and transmit the applied gravity and lateral loads safely to the ground without exceeding the allowable stresses in its members.
Explain what the superstructure of a building is.
The superstructure is the vertical extension of a building above the ground, including all columns and beams and load-bearing walls supporting the floor and roof structures.
Explain what the substructure of a building is
The substructure is the underlying structure forming the foundation of a building.
List all 7 kinds of horizontal members (Hint: s, b, t, g, j, l, c)
Slab, Beam, Truss, Girder, Joist, Lintel, Cantilever
List all 10 types of connectors
Nut and bolt · gusset plate · screw · nail · scarf joint · mortise and tenon · butt weld · rivet · fillet weld · splice
What is the job of a structural engineer?
Determine all the forces acting on the static system and to establish the bearing pressure in order to fulfil the conditions of equilibrium.
Explain what Static load is
Static loads are applied slowly to a structure without fluctuating rapidly in magnitude or position
Explain what Dynamic load is
Dynamic loads are applied suddenly, often with a rapid change in magnitude and point of application. The two major types of dynamic loads are wind and earthquake loads.
Explain what permanent load/dead load is
The permanent load or dead load is the weight of the bearing structure itself including all permanently connected building elements.
Explain what imposed load/live load is
The imposed load or live load is a collection of changeable forces acting on the structure, such as the loads resulting from occupancy, which includes furniture, machinery and people, but also the loads resulting from collected snow or water, and ground pressure.