Question:
An Organization decides to have small scrum teams with less than three developers. The likely result could be a) The team may have decreased interaction. b) The Team may have skill shortage c) The Team may low productivity gains d) All of the above
Author: Avinash UpadhyayAnswer:
D) All of the above While Scrum team should be small enough to nimble, fewer than three developers decreases interaction and results in smaller productivity gains. Smaller Scrum Team may encounter skill constraints during the sprint causing the developers to be unable to deliver a valuable and useful increment.
0 / 5 Â (0 ratings)
1 answer(s) in total